Independent DIB implementation resource — not affiliated with or endorsed by the U.S. Department of WarView the official DoW campaign ↗
LIVING TIMELINEREVIEWED 2026-07-28

Compliance policy status

The dates that actually drive Defense Industrial Base decisions right now — what is in effect, what is proposed, what is suspended, and what is still pending. Built from officially published sources only.

What this page is for

Policy is moving faster than most compliance plans can absorb. This page exists so you can check the state of play in one place, then go read the primary source. It records only officially published items — direction that has been reported but not published belongs in a conversation with your contracting officer, not in a plan. Always verify against your own solicitation, contract, and flowdowns.

EXPLAINER · 5 SCENES · ≈40 SEC · CAPTIONS, NO AUDIO

POLICY-CMMC-SUSPENSION in 40 seconds

The problem, the plain-words meaning, three key moves, and what “done” looks like.

NEXT UP
Aug 14, 2026CMMC program-review request for information closes
~Sep 11, 202660-day program review concludes
  1. EFFECTIVE

    CMMC Program Rule established

    32 CFR Part 170 established the CMMC Program architecture — the levels, assessment types, scoping rules, POA&M limits, scoring, and affirmation requirements. This rule has not been repealed.

  2. EFFECTIVE

    CMMC acquisition rule effective — Phase I begins

    The acquisition rule took effect and Phase I implementation began. Requiring activities began including Level 1 and Level 2 self-assessment requirements in solicitations where FCI or CUI is anticipated.

  3. PROPOSED

    Government-wide FAR CUI rule proposed

    The FAR Council published a revised government-wide CUI proposal within the broader FAR overhaul (91 FR 37550). It would extend a common CUI method across executive-agency acquisitions and points at NIST SP 800-171 Revision 3. It is a proposed rule, not an operative clause.

  4. SUSPENDED

    CMMC Phase II transition suspended

    The Department suspended the Phase II transition during a 60-day program review. Level 2 (C3PAO) and Level 3 (DIBCAC) requirements may not be designated; affected solicitations and contracts are to be amended or modified. November 10, 2026 is no longer an operative transition date.

  5. COMMENT DEADLINE

    Comments closed on the FAR overhaul / CUI proposed rule

    The public comment period for the June 2026 proposed rule closed. No final-rule date has been announced.

  6. RFI DEADLINE

    CMMC program-review request for information closes

    Industry feedback to the CMMC reform task force is being collected through a public request for information. This is the formal channel for contractors to put cost, capacity, and implementation evidence in front of the review.

  7. REVIEW ENDS

    60-day program review concludes

    Approximately sixty days from the July 13 suspension. Further CMMC guidance was promised after the review; treat the end of the review as the point to re-read direction, not as an automatic restart date.

  8. PENDING

    Revised phase schedule — not yet published

    No replacement phase schedule has been published. Any specific future certification date you hear before official guidance is issued should be treated as rumor, not planning input.

BRIEFING DECK · 8 SLIDES · FREE

Brief your leadership in ten minutes

The same analysis as an editable PowerPoint deck — what changed, what did not, the numbers that still govern, the three layers, the four gates, and a 30-day action list. Speaker notes included on every slide. Use it internally, with your board, or with your supply chain.

Download the deck (.pptx)